Since our last report we completed the sill and floor over the basement. We also sealed the basement walls, back-filled the foundation and leveled the gravel for the garage area slab. The picture is the sill and floor over the basement before sealing the basement walls. The panels in the back are the Rcontrol (SIP) panels.
We should have the slab poured early next week. After this is completed we should be able to start setting up the Rcontrol (SIP) panels.
We specified the kitchen appliances so we were able to complete the cabinet design We signed the contract for the cabinets and the floor tile. We also purchased the appliances for the laundry/mud room.